Size & source
Map your models, users, budget, and site requirements. Compare supplier configurations and confirm the exact bill of materials.
GPU accelerators / Blackwell
Plan Blackwell-based acceleration as part of a compatible AI server deployment.
Configuration, availability, and commercial terms confirmed by quotation.
START WITH THE WORKLOAD
High-throughput inference and model workloads that benefit from a supported Blackwell stack.
Integrated server platforms with matching power, cooling, and interconnects.
B200 sourcing is scoped as a compatible system configuration; a standalone GPU is not assumed to fit an existing server.
FROM REQUIREMENT TO RUNNING SYSTEM
Assess the workload against available system configurations.
Coordinate sourcing and site readiness with the system supplier.
Configure the model-serving stack and operational monitoring.
THE SERVICES AROUND YOUR HARDWARE
Map your models, users, budget, and site requirements. Compare supplier configurations and confirm the exact bill of materials.
Coordinate hardware supply, delivery, rack or workstation installation, networking, and power and cooling prerequisites.
Set up supported drivers, CUDA, containers, and serving engines such as vLLM, Ollama, or NVIDIA NIM where suitable.
Check the agreed workload, access controls, monitoring, and recovery procedures. Hand over documentation and scope ongoing support.
From ambition to action
Share your models, expected usage, budget, location, and target deployment window. We’ll confirm the right configuration and sourcing options.